So I'm at the job site today. I thought all the digging was done. Wrong!!!
Eachy building gets 4' x 5' x 7' deep infiltration well to let roof drains get the water back into the ground. Anyway the digging begins first hole nothing, holes 2 & 3 had lots of ash about 3' down and lot's of bottles. Mostly junk but I had my digger with me today and as the mini excavator moved to the next hole I would dig in the piles. Glad I did. Here is the haul from today.
Eachy building gets 4' x 5' x 7' deep infiltration well to let roof drains get the water back into the ground. Anyway the digging begins first hole nothing, holes 2 & 3 had lots of ash about 3' down and lot's of bottles. Mostly junk but I had my digger with me today and as the mini excavator moved to the next hole I would dig in the piles. Glad I did. Here is the haul from today.